Skip to content

Milestones

  • Anik G1 Separation
  • Fifth Burn
  • Fourth Burn
  • APT Jettison
  • Third Burn
  • Second Burn
  • First Burn
  • Stage Separations
  • Liftoff
  • Rollout to Pad 39
  • Breeze M Fueling
  • Begin Joint Operations
  • SC Fuel Loading
  • SC/GSE Arrival
  • Breeze M Arrival
  • Main Team Arrival
  • Proton Arrival

 

  • Milestones in progress
  • Milestones completed

Anik G1

Launch Date: 
April 16, 2013 - 12:36am
BKR

Vehicle: Proton M/ Breeze M

Twitter Tag: #AnikG1

The Satellite

  • Satellite Operator: Telesat
  • Satellite Manufacturer: SSL
  • Purpose: C-, Ku- and X-band Services and DTH
  • Platform: SSL 1300
  • Separated Mass: ~4,905 kg
  • Satellite Design Life: 15 years

Highlights

  • 9th Telesat Satellite Launched on ILS Proton
  • 26th Space Systems/Loral Satellite Launch on an ILS Proton
  • 2nd ILS Proton Launch in 2013
  • 79th ILS Proton Launch Overall

Launch Resources

Anik G1 Mission Control V2

Connect with ILS

Facebook Twitter YouTube Linkedin