Skip to content
January 28, 2015
On a crisp, crystal clear winter morning a few brave mission team members bundled up for the frigid temperatures and stood with bated breath and excited energy as the ILS Proton with I5F2 SC onboard... Read more
January 28, 2015
With expert efficiency the KhSC fueling team has completed their hazardous fueling operations.  Due to the hazardous nature of the operations, the entire mission team was relocated to the hotels... Read more
January 14, 2015
Since SC arrival the team has been meticulously hard at work pulling many long hours to ensure that our t’s are crossed and I’s are dotted as we progress through numerous testing... Read more
January 14, 2015
No matter whether it is 122 °C (50°F) degree heat during the height of summer or -6°C (21.2°F) degrees during winter, there is always room for a BBQ.  A few members from the... Read more
December 29, 2014
SC Arrival day came expeditiously.  A SC off-load planning meeting prior to the SC arrival ensured that all parties were on the same page and that our off-load progressed with precision timing.... Read more
December 29, 2014
The Inmsarsat-5 F2 launch campaign officially begun on 16 Dec 2014!  Quite different from the norm, the I5F2 campaign is a split campaign allowing most of the mission team to spend times with... Read more

Connect with ILS

Facebook Twitter YouTube Linkedin