May 11, 2015

After the Antonov arrived carrying the Inmarsat-5 F3 SC at 10:00 on 1 May, the teams performed a flawless off-load. The SC then took a train ride to the 92A50 processing facility and arrived around 21:00, and was tucked safely away for the night in Hall 101.

The teams were back at it on 2 May performing the fitcheck that went succesfully in preparation to moving the SC into Hall 103A for SC standalone processing.

May 11, 2015

The Inmarsat-5 F3 launch team couldn't have asked for a more beautiful Spring day to begin the launch campaign when they arrived on 30 April 2015. Stay tuned as the team gets settled in and gets things rolling!