Skip to content
June 3, 2013
We have had a successful mission with the ILS Proton Rocket, carrying the SES-6 satellite built by Astrium for SES. We have had confirmation that the SES-6 satellite separated from the vehicle on... Read more
June 3, 2013
We have confirmed that the Breeze M upper stage has successfully completed its 3rd burn, APT jettison and its 4th burn. The vehicle is now in a 5 hour coast period, during which we will have... Read more
June 3, 2013
We have confirmed that the Breeze M upper stage has successfully begun its 3rd burn.  The Breeze M will be out of range until approximately 3:13 pm EDT or  7:13 pm GMT. Additional... Read more
June 3, 2013
As the Breeze M upper stage of our Proton M rocket continues its climb into space with the SES-6 satellite onboard, we have received confirmation that the 2nd burn of the upper stage occurred and... Read more
June 3, 2013
We have received confirmation of completion of the first burn. The vehicle is now scheduled to be out of range for about an hour, after which we will hear confirmation of the second burn. Read more
June 3, 2013
We had a successful liftoff about 11 minutes ago of the ILS Proton M Breeze M rocket, which is carrying the SES-6 satellite onboard. The three stages of the Proton vehicle have performed as planned,... Read more
June 3, 2013
We have liftoff! of the Proton M Breeze M rocket and the SES-6 satellite. Read more
May 29, 2013
Summer has most definitely arrived in Baikonur, with daytime temperatures being in the 90s for the last few days, and forecasted to stay that way for the rest of the campaign. We’ve all been... Read more
May 21, 2013
After saying goodbye to most of the Eutelsat 3D team and congratulating them on a successful launch, we had a busy few days of spacecraft (SC) propellant loading. Everything is going well so far, and... Read more

Connect with ILS

Facebook Twitter YouTube Linkedin