Skip to content
March 26, 2013
We have had a successful mission with the ILS Proton Rocket, carrying the Satmex 8 satellite built by SSL. We have had confirmation that the Satmex 8 satellite separated from the vehicle on schedule... Read more
March 26, 2013
We have confirmed that the Breeze M upper stage has successfully completed its 3rd & 4th burns, as well as jettisoning its additional propellant tank. The vehicle is now in a 4-hour coast period... Read more
March 26, 2013
As the Breeze M upper stage of our Proton M rocket continues its climb into space with the Satmex 8 satellite onboard, we have received confirmation that the 2nd burn of the upper stage... Read more
March 26, 2013
We had a successful liftoof about 15 minutes ago of the ILS Proton M Breeze M rocket, which is carrying the Satmex 8 satellite onboard.  The three stages of the proton vehicle have performed as... Read more
March 26, 2013
We have liftoff of the Proton M Breeze M rocket and the Satmex 8 satellite. Read more
March 14, 2013
Following the successful restart of the launch campaign and completion of fueling of the Satmex 8 spacecraft, SSL put on a large BBQ at the Cosmos for the team. Everyone was able to enjoy ribs, tri-... Read more

Connect with ILS

Facebook Twitter YouTube Linkedin