Skip to content

Centenario | SC Off-Load

April 6, 2015 3:20 pm (GMT)
ILS Launch Team

A cool and breezy spring day provided the back drop for the arrival of the Antonov carrying the Centenario SC. The amalgamated teams performed effortlessly to have a flawless off-load with the SC arriving safe and sound via train at the 92A50 processing facility at 0100 on 3 April. After some well-deserved rest, the respective teams were back in action and successfully performed the SC fitcheck prior to transferring the SC into H103A for SC standalone processing.

A job well done!

Centenario Blog

Connect with ILS

Facebook Twitter YouTube Linkedin