• image

SIRIUS FM-5 Blog

+ SC Arrival/ Fitcheck

Posted by ILS Launch Team, 9:26 a.m. on 28 May 2009 | 0 Comments

The SC arrived right on schedule on Tuesday. Due to some
extremely windy conditions, it arrived at the processing
facility early the next morning, where it was unpacked and
prepared for the Fitcheck with the adapter. After a
successful Fitcheck on Wednesday, the SC made its way into
Hall 103A for standalone operations. We will welcome the
propulsion team and say good bye to some of our colleagues
with a barbeque on Sunday.

0 comments | Read the full post



+ Arrival In Baikonur

Posted by ILS Launch Team. 8:42 a.m. on 25 May 2009 | 0 Comments

The majority of the Sirius FM-5 campaign team landed in Baikonur just after a rare rain shower on Saturday afternoon. We were met by a cool breeze and a gorgeous day. The days have remained cool and sunny and we hope that this uncharacteristically fine weather holds for our Memorial Day barbeque this evening and spacecraft arrival tomorrow.

0 comments | Read the full post



+ Welcome to the SIRIUS FM-5 Blog

Posted by ILS Communications Team, 10:30 a.m. EDT on 26 May 2009 | 2 Comments

Welcome to the third ILS Proton launch campaign for 2009 – the launch of the Space Systems/Loral-built, SIRIUS FM-5 satellite for SIRIUS XM Radio. Follow along with the mission team as they prepare for the launch.

2 comments | Read the full post



1 2