Skip to content

Milestones

  • AsiaSat 9 Separation
  • Fifth Burn
  • Fourth Burn
  • APT Jettison
  • Third Burn
  • Second Burn
  • First Burn
  • Stage Separations
  • Lift-Off
  • Rollout to Launch Pad
  • Breeze M Fueling
  • Begin Joint Operations
  • SC Fuel Loading
  • Breeze M Arrival
  • Proton Arrival
  • SC/GSE Arrival
  • Early Team Arrival

 

  • Milestones in progress
  • Milestones completed

AsiaSat 9

Launch Date: 
September 29, 2017
BKR

Vehicle: Proton M/Breeze M

Twitter Tag: #AsiaSat9

The Satellite

  • Satellite Name: AsiaSat 9
  • Satellite Operator: AsiaSat
  • Satellite Manufacturer: SSL
  • Purpose: TBS
  • Platform: SSL 1300
  • Separated Mass: 6140 kg
  • Satellite Design Life: 15 years

Highlights

  • 3rd ILS Proton Launch of 2017
  • 96th ILS Proton Launch Overall
  • 5th AsiaSat Satellite Launched on ILS Proton
  • 31st SSL Satellite Launched on ILS Proton

Launch Resources

AsiaSat 9 Mission Poster

Connect with ILS

Facebook Twitter YouTube Linkedin