After the Antonov arrived carrying the Inmarsat-5 F3 SC at 10:00 on 1 May, the teams performed a flawless off-load. The SC then took a train ride to the 92A50 processing facility and arrived around 21:00, and was tucked safely away for the night in Hall 101.
The teams were back at it on 2 May performing the fitcheck that went succesfully in preparation to moving the SC into Hall 103A for SC standalone processing.
11 May 2015