Giving Thanks

[img]/assets/Images/Media/Ciel-2-Blog/SES-Chefs.JPG[/img] SES Engineering and ILS hosted a Thanksgiving feast fit for kings and launch campaign personnel.  The cooking started the previous afternoon and continued into our Thanksgiving Day since there was not enough space to cook all of the birds.  Everyone used the half-day break before joint operations to enjoy the turkey, mashed potatoes, gravy and quintessential cranberry sauce.  (No Thanksgiving is complete without it!) The mouth-watering feast was prepared by our in-house SES Engineering chefs.   In addition to launching satellites, our customer (launch program manager and engineers) could give the best chefs around the globe a run for their money! All of us are away from our loved ones on this special day.  Even with land and oceans separating us from our families, the unity of our Baikonur family made the day more poignant! After our early dinner, we piled into the bus and vans to head out to the viewing area for the Soyuz launch.  We joined what seemed like half of Baikonur town to watch what turned out to be a spectacular launch, with the engine plumes catching the setting sun and blazing red, orange and blue. We concluded our day with … you guessed it: a late supper of copacetic turkey sandwiches then headed off to bed to prepare for an early morning start to joint operations.

READ MORE

Payload Fairing Installed

[img]/assets/Images/Media/Ciel-2-Blog/Whered-SC-Go.JPG[/img] This is a time of many goodbyes.  The mid-campaign exit charter left with more than half of our French colleagues and one of the customer representatives.  It is also time to say goodbye to the spacecraft (SC), visually anyway, as the payload fairing is ready to be installed. With the SC horizontal and hovering above a rail track, the bottom half of the fairing is situated on a rail car below. It sits in a cradle and is hand cranked in to position under the SC. Once that is in place, the upper half of the fairing is hoisted up by crane and positioned above the prone SC and lowered to mate with the bottom half. Under the watchful ThalesAlenia Space (TAS) team’s supervision, the maneuvers were successful and the Ciel II SC was officially encapsulated in preparation for its ride into orbit. This newly assembled configuration is now called the ascent unit (AU). Once the two halves are secured, the team spends two days performing electrical tests and verifying communications with the encapsulated SC. The term “team” certainly applies in this case, as a veritable plethora of activities are ongoing while the TAS specialists and the Khrunichev teams work together performing pre-launch testing. It is impressive to behold the satellite hovering in a horizontal position, and seeing the whole AU cantilevered off of the tilter stand is even more impressive. Time now to mate the AU to the Proton launch vehicle! The fun continues… One of the more technical operations that is performed is the signing of the payload fairing by the entire launch team. It takes a lot of coordination with all the parties. The exacting nature of this complex operation is really quite a spectacle, as the team members take turns climbing up the ladder, putting their personal touches on the fairing logos and then climbing back down the ladder.  The critical decisions include: what to write and who to dedicate the launch to: parents, children and loved ones of all sorts are named on the fairing as a tribute to them from the launch team members.  It’s a great photo opportunity for the team. It is also the last thing we do prior to mating the AU to the launch vehicle. It has been a long road for the SC contractors and their satellite, and it is at this point that they hand it over to the capable hands of our Russian partners from Khrunichev.

READ MORE

Stand-alone Testing Complete

[img]/assets/Images/Media/Ciel-2-Blog/Mated.JPG[/img] Yahoo! Stand-alone testing is complete.  We have started the next phase known as Joint Operations.  This is when the SC is mechanically and electrically mated to the Launch Vehicle hardware.  To put it simply, this is when we start making the little pieces into one big piece! Joint Operations involves a lot of hard yards (man hours) being put in by a plethora of people.  The first step was to mate the SC to the adapter system – a conical structure that attaches to the bottom of the SC. Next, the SC-adapter combo was mated to the Breeze M upper stage. We successfully completed these steps today after about 18 hours of work, taking into account all the testing and mechanical and electrical checks that had to occur.  Today at 1600 hours, the SC-adapter-Breeze M stack will be rotated from vertical to horizontal and encapsulated in the payload fairing. The combination of all these pieces into a single unit is known as the Ascent Unit (AU). The SC will remain in a horizontal orientation until we move the whole launch vehicle to launch pad four days before launch. The first order of business and required for encapsulation is the need to have the SC in a horizontal position. This is one of the more jaw-dropping operations to witness. The newly mated Breeze M engine, PLA and satellite fully loaded with propellant are mounted to a turnover fixture (aka the tilter). That is a whole lot of inches and a whole lot of pounds, supported only by the clampband (a thin metal ring that joins the SC to the PLA).  The entire structure is rotated from vertical to horizontal in order to install the payload fairing.  It can be quite nerve-wracking during these 30 minutes. However, the method once again proved to be successful. The Breeze M, the payload adapter and the flight hardware moved to horizontal just as they were designed. It really is a spectacular sight to see.

READ MORE

Full Tank!

[img]/assets/Images/Media/Ciel-2-Blog/bbq.jpg[/img] Spacecraft fueling is complete!  It was a long weekend for the propulsion teams with the spacecraft now on-board. Tanks were successfully loaded with oxidizer and fuel.  Since this is a hazardous operation, all non-essential personnel were required to stay out of 92A-50.  So we used that as a good reason to hold the first barbeque of the campaign.  The weather was great, our customer and other grillmeisters manned the grills and kitchens, and everyone put on their coats to enjoy the burgers, brats, chicken, potato salad, baked beans and… but we will not bore you with a list of all of the delectable dishes that we enjoyed – check out the pictures!  We are now getting ready for our next big feast: Thanksgiving. We are celebrating a day early, since joint operations start on Thursday and we have some very busy days ahead. Also included in our Thanksgiving festivities is a trip to see the launch of a Progress mission to the International Space Station!

READ MORE

The Fog Rolls In

[img]/assets/Images/Media/Ciel-2-Blog/Where-did-Launch-Pad-Go.jpg[/img] Grounded! Due to the ever-persistent fog, sent to us by an ornery Mother Nature, some of our team members have been grounded in Baikonur until Krayny is reopened and the commercial URALAir flight comes in from Moscow. Standalone operations continue as we march forward towards joint operations, which start on Thanksgiving Day — we will have much to be thankful about.

READ MORE

Our Specialists are Here!

Our Thales/KhSC specialists have arrived! Yesterday the long-awaited URALAir flight finally touched down at Krayny (after an hour delay due to fog – in Moscow!) and offloaded the key personnel needed to keep our launch campaign schedule on track. Today, along with warm, balmy weather and scintillating views of the horizon and sun, we continue standalone operations and prepare for propellant loading. During propellant loading all non-essential personnel will have downtime to continue exploring Baikonur town, rock out while playing Rock Band, or just be plain ol’ lollygaggers if they so choose. Additionally, our customer is going to don their BBQ Chef hats and kick off the first BBQ of the Ceil II campaign. Fog, cold, snow or shine – any weather is BBQ weather! Photos to follow next week (proof that we are staunch BBQ enthusiasts).

READ MORE

Baikonur and Birthdays

[img]/assets/Images/Media/Ciel-2-Blog/Make-A-Wish.JPG[/img] Dense fog has crept in on its little cat feet for the last several days and, since the temperature has been inching towards zero, we were greeted for lunch with all of the trees and bushes covered with a layer of hoar frost; the decorative harbinger of winter and snow. In keeping with the axiom about “all work and no play,” it was decided that we were overdue for a little bit of play. With standalone testing successfully underway, most of the teams spent the day meandering around Baikonur town, taking in the local cuisine and finding bargains at the market. (Getting Christmas shopping done – for once before 24 December!) We also took advantage of the contingency day to gather the troops to celebrate not one but four birthdays for the previous week. Being the ubiquitous team that we are, we attended the birthday dinner that Thales put on in honor of the four birthday boys. There was much merriment, toasts and conversation. In keeping with the French birthday tradition, all of the women at the dinner gave each birthday boy an osculatory gift. Our repertoire of international birthday traditions is ever expanding!

READ MORE

Arrival at Hall 101

[img]/assets/Images/Media/Ciel-2-Blog/Precious-cargo.jpg[/img] Early morning on Wednesday (04:00 to be exact – we know as we were awake), the spacecraft (SC) in its container made its way on the train from the airport to the processing facility, referred to as 92A-50. The main room of this building, known as Hall 101, is absolutely huge — more than large enough to accommodate all the train cars containing the SC and support equipment, with room to spare for some football shenanigans if so inclined! The SC container was offloaded, placed on the floor of the hall, and all the associated equipment was placed in the areas needed to support the unpacking and testing of the SC. This mammoth task was finished by 10:40 a.m. – making for a very long 25-hour day counting all the operations, but using two shifts of personnel. Once the SC container was offloaded and cleaned, the riggers came in and started the process of removing the SC from its container. This entails removing the lid, rotating the SC from horizontal to vertical, and using the crane to lift it off its supports. The next steps are SC stand-alone testing and propellant load preparation. The ThalesAlenia SC contractor has been busy testing the Ciel II SC in what is known as stand-alone operations. This is the time in the beginning of the launch campaign when the SC contractors work alone to test and verify that the SC is healthy, load propellants and configure the SC for launch. After all these steps are done and the SC is completely ready to go for launch, we start “joint operations” where the SC is integrated with the Proton LV. Right now, ThalesAlenia is in the process of verifying that the SC is completely ready before we proceed to the next step: loading propellants into the tanks inside the SC. In parallel, the SC propellant loading team has been busy with all their checkout preparations. Everything is proceeding per the plan — a result of the last 18 months of preparation by the Ciel II teams. After all was said and done, we made the time to celebrate the dual birthday of our customer. We have been quite cheeky and given them the nickname of “The Twins.”

READ MORE

SC Offload

[img]/assets/Images/Media/Ciel-2-Blog/ciel-II-SC-Unloading.jpg[/img] The Antonov 124 landed at Yubeleiny Airport at 16:00 local time carrying the Ciel-II spacecraft. Along with the satellite came everything needed to get it ready for launch, as well as some other supplies shipped in by members of the campaign team. After five hours of offloading, the train with the spacecraft and supplies left the airport for the long ride to Building 92A-50, where it arrived at 04:00 Wednesday. After a long evening on the cold tarmac, the team got back to the hotel to warm up, eat a late supper and get some sleep to be ready for the train’s early-morning arrival at 92A-50.

READ MORE

The Campaign Begins!

The sixth ILS launch campaign of 2008 is under way. Two members of the early team set out on the 6th of November from Virginia and met the rest of the team in Moscow to kick off the late fall launch of the Ciel II spacecraft from the Baikonur Cosmodrome. Having all arrived safely in Moscow we met up to share a meal and then settled in for a quick one-night stay.  Our next day started bright and early with our flight to Baikonur.  We arrived on a beautiful day amidst snow flurries, and waved our hellos/goodbyes to members of the outgoing ASTRA 1M team after their successful launch on Wednesday night. After clearing customs and making the short trip to the hotel, we received a warm reception from the Russians welcoming us back for another campaign.  We all settled quickly into our hotel rooms and participated in the safety and security briefing.  The day ended with a hot meal, the renewing of old acquaintances and the introduction of new members of the launch team. The heat has been turned on in Building 92A-50 and we have officially begun the Ciel II launch campaign. Winter woolies have been donned and are being put to good use!

READ MORE

Contact Us!

For the latest news and information, or if you have a question, please email ILS at contactus@ilslaunch.com