Fitcheck Successful

Sunday 8 May, was not only Mother’s Day but also a mammoth milestone as the team prepared for and successfully completed our Intelsat 31 fitcheck. 

READ MORE

Operations on Point

Our team is full steam ahead in our campaign preparations. Both the SC and LV have been undergoing the gauntlet of tests necessary for a healthy SC and LV also known as stand-alone operations.

READ MORE

Launch Vehicle at 92A50

Good day here at launch campaign….after much anticipation and daily updates on its journey, our ISDLA-2 launch vehicle has arrived safe and sound at 92A50 and it’s 12 railcars are now being off-loaded into H111 for processing.

READ MORE

Fond Farwell

It is with a certain catch in our throats that the Intelsat 31 mission team bid a heartfelt and fond farewell to our long standing friend, mentor, colleague Mr. Alexey Popov.

READ MORE

Team Building

With the initial flurry of activity completed, the SC housed in H103A and running thru the gauntlet of tests, our first team building exercise was held….a welcome to Baikonur BBQ.  The team dined on ribs, chicken and hot links in addition to a plethora of nibbles and side dishes.   By nights end old friends had caught up and new friends had been made.  Not only do SSL build great SC they are also seasoned BBQ Masters! It’s a win/win for all on this mission.

READ MORE

Early Team Arrival

We had optimal start to our Intelsat 31 campaign in Moscow…team members were bright eyed and bushy tailed for our 0730 hotel pickup.  Sufficiently full from a delish breakfast, luggage stowed, the bus drivers made short work of the journey to Domodevedeo airport to catch our charter.  We were all pleasantly surprised to have barely any traffic on the road…it definitely helps that it was a) early and b) a Saturday morning.

READ MORE

Full Steam Ahead!

The last three days have been a beehive of activity in Hall 101 as teams have come and gone to perform a multitude of operations to ensure that the SC and Breeze-M are healthy, verified and ready for upcoming operations.  The cumulation of all these operations will be an encapsulated SC/Breeze M thus transforming into our E9B AU (Ascent Unit)…aka the pointy piece (nose cone) of the launch vehicle.

READ MORE

Joint Operations has begun!

There you have it….as Sunday 13 Dec draws to a close, so does Day 1 of Joint Operations for the E9B launch campaign.  Our day started early, Airbus prepared and transferred the fully fueled SC from Hall 103A thru to Hall 101.  Once in H101 a plethora of operations took place prior to the actual lifting of the SC and mating with the KhSC Payload Adapter.  The remainder of the day has been spent connecting umbilicals, running a battery of electrical tests, and finalizing preparations prior to the lifting and mating with our Breeze-M.  It has been a day of multiple teams of specialists performing incredibly detail orientated work.  Tonight’s operations will close with another electrical test and review of test results. 
Tomorrow Monday 14 Dec will be Day 2 of Joint Operations and yes…you guessed it, another early kick-off for the day.

READ MORE

E9B Fully Fueled

…and we are fueled! 2 days of MON loading, 1 day of Hall 103A reconfiguration, 2 days of MMH loading and we now have a fully fueled E9B SC!  Well done Airbus Stevenage CPS team and ground support crew!

READ MORE

Contact Us!

For the latest news and information, or if you have a question, please email ILS at contactus@ilslaunch.com